This piece can serve as a completed look especially around outlets and light switches.
Installing gear wall panels.
5 apply sealant on the wall as shown.
Endurathane wall panels installation guide these instructions are to only be used as installation guidelines.
The steel shall be aligned to per the tolerances established in the aisc code of standard practice section 7 and the supplement modification control section 7 11 3 adjustable items.
Box contains 6 pieces of 8ft.
Organize your home garage and workshop with these gladiator gear wall panels 2 pack.
3 install the standard internal profile in the corner.
Distance between each dots approx.
Masonry block poured concrete wall before you can install the panels on poured concrete or masonry block walls you must install 2 5 08 cm x 4 10 16 cm wooden studs to the wall with the 4 10 16 cm side against the wall.
6 install the first panel.
Apply adhesive step 7.
Trim to fit step 5.
Ekena millwork neither installs the panels nor has any control over the installation.
2 install the base profile with a clearance of approx.
4 apply sealant in the internal profile on the left hand side.
Organize your home garage and workshop with these gladiator gear wall panels 2 pack.
It is the responsibility of the contractor and or the installer to ensure panels are.
0 5 cm from the shower tray and screw the base profile to the wall.
Cut openings step 6.
This slat wall styled panel system is the foundation of the gladiator wall system and is designed to help you reclaim your floor by maximizing your wall storage capabilities.
Long gearwall panel trim complete the look of your gladiator wall system with a gladiator gearwall panel trim.