We re going to do a pitch transition or change.
How to transition rubber roof to ashphalt.
The average cost for rubber roofing is 300 400 per square.
For more information please visit http.
This can help you save money in the long run.
Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
Find out how to join an epdm rubber membrane to an existing roofing material such as felt using a termination bar.
Rubber roofing can last much longer than asphalt roofing and are very energy efficient.
Clean both surfaces with a rubber membrane cleaner.
Although rubber roofing is more expensive its lifespan is double that of asphalt roofing so over the long term it will actually cost less.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.
Rubber 6 product length in 5 10 2 less than 5 1 10 15 5 15 20 1 50 or.
The installation of rubber roofing does not require as much labour compared to other roofing materials reducing the amount of time spent on prepping your roof and the amount you spend on labour costs.
We need to do something where that change happens so the panels can go down and water can come off hit the lower slope and come off the roof.
Cut away the asphalt just wide enough to remove the asphalt.
The most trusted miami roofing contractor professionally describes the installation of thi.
Carlisle firestone or gaf all have similer type seam tapes.
Get free shipping on qualified transition flashing or buy online pick up in store today in the building materials department.
This video shows the transition of a shingle roof to a metal roof.
You ll have a steeper part of your roof turning into a lower slope so there s a steeper pitch up top and a lower pitch on the bottom.
All style large retro split storm collar roof flashing for 6 in.
X wall square structural pipe model 706066 181 78.
A square equals 100 square feet.
Cut strips of comparible rubber wide enough and long enough to overlap your cut away asphalt by 3 5 on each side.
They had the right idea but the peel and stick they used was rubberized asphalt which reacts with epdm.
The starter strip must be securely glued on the armourvalley membrane.
At the roof transition shown in photo roofers had installed peel and stick over the epdm lap.