It can easily be installed by a single person providing consumers with a quick easy and effective solution in the installation of a tarp.
How to tarp a shingle roof.
Nail each side of the shingle to each side of the ridge just below the shingles self sealing strip.
Lay the tarp across the roof so that at least 4 feet 1 2 m lies on the sloped part of your roof on each side known as the peak.
You ll need a tarp with grommets so you can tie it off and drive nails in or around your soffits to secure it.
The 2 by 4 should be about 2 feet longer than the tarp width.
Lay the tarp out flat over the roof.
Your 2 4 should be two feet longer than the width of your tarp.
Continue along the length of the ridge line.
Next install furring strips to the parallel bottom side of the tarp.
Install the next shingle approximately 2 3 past the seal strip of the first shingle.
Using nails attach the peak end of your tarp to a 2 4.
Once this course is laid you can begin snapping horizontal chalk lines up the roof to ensure straight rows.
Let the rest of the tarp hang off the lower border of the roof that overhangs the wall known as the eave.
Then fold the excess tarp under a few rotations for a tight clean fit.
Use a sturdy extension ladder that extends at least 3 feet above the eaves to climb onto the roof and secure the bottom to the foundation and the top to the eaves or fascia so it doesn t move.
For a damage free method that doesn t require patching you could cover the entire roof with plastic sheeting feed rope through the sheeting and stake it into the ground with tent supports.
Make sure to tighten the tarp as much as possible to the structure.
Your tarp must be fully sandwiched so it won t come loose in windy or stormy conditions.
It eliminates the need for hammers wood stripes nails bricks and sandbags when trying to cover the damaged roof area.
Make sure to expose 5 in.
Extend the top edge of the tarp over the roof.
This tarp mitigates the water damage while protecting the property.
Partially unroll your tarp to cover the damaged area from the roof s eaves to peak.
Your last shingle is an exposed shingle.
Starting at a corner drive a galvanized roofing nail into the strip and into the roof sheathing.
Screw the 2 by 4 directly into the roof to secure it.
Never lay the tarp out during a storm.
Tear off the old shingles.
Use four roofing nails per shingle as indicated on package instructions six nails in high wind areas.
Place the first shingle end flush to the edge of the roof.
Wrap your tarp around the board then secure the board to the roof with a screw.
Ensure your tarp is properly positioned and weighed down with 2 x 4 wooden planks before securing it to your roof.
There should be an additional 4 feet of tarp on every side.
Lay more 2 by 4s on either side of the tarp and attach those as well for a tight well secured water barrier.
Place the 2 4 against the roof along the rake to prevent water collection.