To install the furring strips start by cutting them to size so they run from one end of the surface to the other.
How to run lap siding evenly.
For vertical applications siding should be nailed to horizontal blocking or furring strips.
Use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Preparing walls for lap siding the walls should be stripped of all previous siding and the surface should be fairly smooth and flat because lap siding will follow along any contours.
During this video i take you thru many of the different lp smartside siding installation tips and tricks i have learned over the years.
Face nail with two nails per piece for 8 inches patterns and wider keeping nails 2 1 2 to 3 inches apart to allow for dimensional movement without splitting.
Some 3 4 inch thick patterns of siding can be applied directly over wall studs.
I am using special siding clamps that lets me do everything solo.
On three of the corners of the house the siding is aligned properly ie.
For siding up to 6 inches wide use one nail one inch up from the lap.
In this video i am using lp smartside lap siding to side my house.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Then nail them to the surface you re working on leaving 16 inches 41 cm between each strip.
Staging the project typically you ll want to work with a partner on a siding project with one person at each end of the siding board.
It protects the sheathing from rain snow and pests.
Establish points of reference before removing the existing siding pinpoint a horizontal reference line 1 on the drawing on the opposite page that runs the full length of the wall such as the lowest point of a frieze at the top or a skirting board at the bottom.
In that case use a siding gauge to evenly space each course for the 7 reveal.
I was contracted by.